Key Takeaways

  • Assign a named internal project owner with real authority and dedicated time before signing any contract
  • Run a full data audit before committing — data quality issues are the single biggest cause of timeline overruns
  • Lock integration scope for go-live; treat required integrations as blocking, defer everything else to post-launch
  • Train power users first, make them internal champions, then cascade training in context — never train everyone weeks before go-live